top of page
  • Facebook Social Icon
  • Twitter Social Icon
  • YouTube Social  Icon
  • LinkedIn Social Icon

Full build MUGA with Polymeric surface

  • Writer: Darren Akeroyd
    Darren Akeroyd
  • May 10, 2019
  • 1 min read

This Primary School MUGA was completed in the half term and features heavy duty goals, weld-mesh perimeter fencing and Polymeric rubber playing surface

コメント


Featured Posts
Recent Posts
Archive
Search By Tags
Whatsapp.png
bottom of page